A range of welding and assembly works on the pipelines of the gas treatment plant was carried out in the short time.
Over 15,000 pipe joints of a range of diameters from 15 to 1400 mm were welded. Installation of stainless steel pipelines was carried out. Assembly of the 120-ton gas air-cooling unit was performed. Assembly and installation of more than 500 tons of steel structures of pipe racks and service platforms were completed.
More than 1,000 fittings and valves were installed. Four types of testing of complete pipelines were carried out.