The prospective construction site is situated in the Russian Federation, Stavropol Territory, Budennovsk city, in close proximity to the STAVROLEN Plant.
The purpose of the Facility construction is to ensure a reliable supply of the STAVROLEN consumers with electric and heat energy and to develop power capacities in the Stavropol Region using gas of the Northern Caspian fields as a raw material. It is expected construction of the CCGT-CHP of 135 MW electrical output.